08-21-2015, 02:37 PM | #1 |
Drives: 2009 Audi S5 Join Date: Jul 2014
Location: Beaverton, or
Posts: 49
|
Going onto status 2000 today, how long before 3000?
Hey,
MacMulkin submitted my 2016 Z51 order today so I'll be at 2000 status shortly, WOOT! I've seen posts talking about how long it takes going from 3000 until your TPW (about 3-4 weeks it seems) but I didn't see anything talking about how long people are waiting in line outside the factory or from 2000 until 3000. How long did you guys who just got 3000 wait? |
08-22-2015, 08:41 AM | #2 |
Drives: '16 Z06 7 Spd, 2024 High Country HD Join Date: May 2015
Location: Kansas City area
Posts: 442
|
Time between status codes
My order was placed for a Z06 on 5/29 but I was told they were not bumping orders against allocations for 2016 models until mid June as they were still building 2015 models.
on 6/18 it went from 1100 to 3000 with a TPW of 7/13 on 7/6 it went from 3000 to 3400, still TPW of 7/13 on 7/14 it showed 4B00, built & bayed. It was actually built on 7/13, inspected, prepped, and shipped early on the 14th and arrived at my dealer around 10pm on 7/14. I'm about 8 1/2 hrs from Bowling Green. Dealer received the complete load on the 14th and had another full load later that week. |
|
|
|
|