|
|
#1 |
|
America FVCK Yeah!
Drives: 2024 Z06 Join Date: Mar 2013
Location: Salisbury, NC
Posts: 1,405
|
Tiling my garage........cuz I'm afraid of epoxy!
I was going to coat it, then epoxy, then I said what the hell...just tile the damned thing. Buying the tile tonight. Should be delivered in the next 48 hours. I'll take some before and after shots. Have less than $500 into it by the time I'm done for 600 sq ft....not too bad. Lots of labor though.
So here's the before shots: ![]() ![]() 3 hours on it last night. Using bag mortar so a little more time investment in mixing. Laid almost 8 rows on the 2 car side. Remembered how bad this is on the knees (did my foyer 3 yrs ago), but forgot about how bad it is on your shoulders, back and hands. I know, what a wuss. Decided to stagger the tiles to avoid the inevitable crooked grout line. With 21' to span front to back it would be too easy to lose the line, staggering lets you off the hook. Anyway, 109 tiles of the 531 total are on the floor. Doing the math: 3 hours = 109 full tiles done 9 hours = 350 (estimated) additional full tiles to lay 6 hours = 72 cut tiles to lay (allowing extra time for cutting and back buttering 4 hours = grouting 1.5 hours = acid wash 1 hour = seal 24.5 Total hours ![]() ![]() Day 2 = 72 tiles in 2 hours (got home late) 181 down and 350 to go!!! No update tomorrow as I'm flying out in the AM to go pick up my CTS-V in Boston. 2 hour flight there, 11.5 hour drive home. ![]()
|
|
|
|
|
|
#2 |
![]() ![]() ![]() ![]() ![]() ![]() ![]() Drives: Maroon 67 rs and CRT 2012 ZL-1 Join Date: Apr 2012
Location: Connecticut
Posts: 2,005
|
Please tell me you cleaned of all the oil that was possibly on the concrete
__________________
" No matter how tough you are when a 2 year old hands you a toy phone you answer it"
|
|
|
|
|
|
#3 |
|
it's mind bottling..
Drives: SGM Join Date: Apr 2011
Location: miami floirda.
Posts: 5,392
|
Looks good
__________________
|
|
|
|
|
|
#4 |
|
America FVCK Yeah!
Drives: 2024 Z06 Join Date: Mar 2013
Location: Salisbury, NC
Posts: 1,405
|
|
|
|
|
|
|
#5 |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Drives: '86 Monte Carlo SS Join Date: Nov 2010
Location: Reno, NV
Posts: 3,119
|
|
|
|
|
|
|
#6 |
![]() ![]() ![]() ![]() ![]() ![]() ![]() Drives: Maroon 67 rs and CRT 2012 ZL-1 Join Date: Apr 2012
Location: Connecticut
Posts: 2,005
|
Good to hear, you don't want any bonding issues with all that work.
__________________
" No matter how tough you are when a 2 year old hands you a toy phone you answer it"
|
|
|
|
|
|
#7 |
|
Master of All Things
Drives: '26 Corvette Stingray Join Date: Jul 2009
Location: Southeast of Houston, Texas
Posts: 22,681
|
I LOVE my epoxy floor.......
__________________
|
|
|
|
|
|
#8 |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Drives: too many Join Date: Jul 2013
Location: oh va pa ma tx
Posts: 3,046
|
^ Now that's a garage well done!
|
|
|
|
|
|
#9 |
|
Master of All Things
Drives: '26 Corvette Stingray Join Date: Jul 2009
Location: Southeast of Houston, Texas
Posts: 22,681
|
Thanks......its 3 1/2 bays......the half bay is where my work bench (you can the see the vice on the bench in the pic) and the 4 1/2' wide stair case is at that takes you up to the attic/storage, which is the full length of the garage and is totally lit with 8' florescent lighting.
__________________
|
|
|
|
|
|
#10 |
![]() Drives: 2010 2SS/RS Inferno Orange Join Date: Mar 2013
Location: San Antonio, TX
Posts: 628
|
The tile looks good but I would be afraid of it cracking under the weight of my car or dropping a tool on it.
__________________
U.S. Army Retired |
|
|
|
|
|
#11 |
![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() ![]() Drives: 2010 2SS IOM L99 Join Date: Jan 2010
Location: LOUISVILLE,KY..
Posts: 7,545
|
i am getting ready to do the snap together plastic tiles.think i would be afraid to use regular tile.
|
|
|
|
|
|
#12 |
|
America FVCK Yeah!
Drives: 2024 Z06 Join Date: Mar 2013
Location: Salisbury, NC
Posts: 1,405
|
Update.
Day 1 = 109 tiles in 3 hours Day 2 = 72 tiles in 2 hours (got home late) Day 3 = 140 tiles in 3 hours (wife and I are starting to get a system. It's called just hand me the tiles and I'll lay them myself.) 321 down and 210 to go!!! Goal is to get all the whole pieces laid tomorrow (Sunday) and then start with the cut pieces each day after work next week. If I time it right, next Sat/Sun will be grouting and sealing and then done.
|
|
|
|
|
|
#13 |
|
NZ Camaro. New Zealand
Drives: 1968 camaro. 2010 2ss Camaro Join Date: Dec 2012
Location: New Zealand
Posts: 284
|
Make sure you put these pics in the garage section too,love to see garage pics.
|
|
|
|
|
|
#14 | |
|
HTCC Member
|
Quote:
__________________
|
|
|
|
|
![]() |
|
|