Quick trip to ACO for a Pipe Coupling and the right diameter threaded rod, the metal cone I found in my basement box of junk parts, some nuts, washers, and a little oil on the threads, and it pressed right out. New bushings and sleeve went in with some BMR jelly and large channel locks. NOW it is time to get serious on suspension reassembly.
Last edited by hesster; 08-07-2017 at 08:40 AM.
|