My Order to build timeline

There are many questions being posted on how long it takes from order to build, there are many factors involved, mainly the options that are chosen and of course constrains. This is not consistent but maybe it will answer some of the questions.

Here is my timeline:

Order placed 7/06/2013 Event Code 1100
Coupe Z51 3LT
Options:
MYC Automatic Trans
C2Z Visible Carbon Roof Panel (went through constraint)
FE4 Magnetic Selective Ride
NPP Exhaust Dual Mode Performance
FAY Carbon Fiber Trim Interior (went through constraint)
J6F Calipers Red
Q7T Black Aluminum wheels
IWE Suede Wrapped upper trim
TTV Carbon Flash Painted Mirrors and Spoiler
ERI Battery Protection

Event Codes and dates:
1100 7/06/2013 Preliminary Order
2000 7/15/2013 accepted by GM
2500 7/17/2013 Preferenced
3000 7/17/2013 accepted by production control
3100 9/09/2013 available to sequence
3300 9/10/2013 scheduled for production
3000 9/13/2013 backwards due to constraints
3100 10/02/2013 available to sequence
3300 10/04/2013 scheduled for production
3400 10/09/2013 Broadcast
3800 10/17/2013 Produced

As you see it’s been over 3 months and a bit of a yoyo ride, now I wait for delivery hopefully this week or next. I’m glad I didn’t change any of my options just to get it sooner, now the time has come and I’m getting exactly what I wanted.