|
Kerbeck's first 166 would be built in the same time frame as the 1, second 166 same time frame as 2, etc. altho the second may be built before the second 166 as Chevy tries to pull retail sold orders as quickly as it can within the limits already stated.
It does not make a difference if the order was entered first or last; what does make a difference is allocation.
Good questions.
Laborsmith
|