|
Okay guys...
Oshawa is not being shut down. Stop worrying.
Plants scheduled to be idled are as follows...
Arlington Assembly (GMT-900)
Bowling Green Assembly (Y-body Corvette/XLR)
Detroit/Hamtramck Assembly (H-body Lucerne/DTS)
Fairfax Assembly (Epsilon-I Malibu/Aura)
Flint Assembly (GMT-900)
Ft. Wayne Assembly (GMT-900)
Lansing Grand River Assembly (Sigma CTS/STS)
Lordstown Assembly (Delta-I Cobalt/G5)
Pontiac Assembly (GMT-900)
Shreveport Operations (GMT-355)
Spring Hill Manufacturing (Traverse)
Wilmington Assembly (Kappa Solstice/Sky/GT)
Wentzville (Savana/Express)
Silao Assembly (GMT-900) (Mexico)
__________________
2023 GMC Canyon Elevation
2023 Ford Expedition SSV (State-Issued)
|