Quote:
Originally Posted by PQ
I'm from the 'Get a bigger hammer' school. lol
|
My thought, if that hat was big enough, a big 6-8ft round pipe, lots of the side wings then pile on the weight and junk, shiploads of hydrolic cement, and then once there is no way it can lift it off, start scaling down the pipe dia.