|
I try to stay out of the political crap, but do work at times in Power Gen. Holy crap be ready for major issues (and/or huge electrical price spikes). I was at a Peaker plant several months ago and they are designed to run at like 5% (natural gas plant). They are running like 35% due to the fact coal plants (baseline energy plants) have been shut down and wind/solar doesn’t produce reliably. Awesome for us as we supply parts to them but $$$$$ which will be passed down to consumers.
__________________
2019 Shock 2SS A10. 2650@10psi/LPE HPFP/XDI+30/LT4 LPFP+JMS/Soler 95mm/Rotofab, E65, CSP 2” Headers/GESI GenII Cats. MM Wild/GM SG3 suspension/1LE Brakes, Velgen VF5 Wheels/GY SC3. JRE Tuned.
|