Old 08-07-2013, 09:36 AM   #1
route66
 
Drives: 66 coupe 78 pace car 2014 coupe
Join Date: Jul 2013
Location: ca.
Posts: 93
Possible TPW with FAY option

Has anyone seen this form before. Got from my dealer about my C7 order. It may be the beginning of dates for production. To me it shows TPW of course it could be changed week of 9-3 and delivery of week of 9-30. Also my car is supposed to be one of the cars that get the FAY option carbon fiber dash.

→ View Event History Current as of 08/05/2013 - 06:53 PM EDT
Effective Date ↑ ↓ Timestamp ↑ ↓ Data Element ↑ ↓ Before Value ↑ ↓ After Value ↑ ↓ User ID ↑ ↓
04/26/2013 04/26/2013 21:22:57 OPTIONS ROO XZKN9T
07/02/2013 07/02/2013 14:00:29 OPTIONS AP9 NPP dramirez001
07/27/2013 07/27/2013 21:17:44 CNTRY-PLT-LINE-CD 151 151 OM0PV005
08/02/2013 08/02/2013 22:07:16 CNTRY-PLT-LINE-CD 151 OM0PV005
08/02/2013 08/02/2013 22:07:16 ESTD-DELVRY-DT 2013-09-02 2013-09-30 OM0PV005

Last edited by route66; 08-07-2013 at 10:46 AM.
route66 is offline   Reply With Quote
Old 08-08-2013, 06:40 PM   #2
GQ4Life


 
Drives: 2010 Camaro SS LS3
Join Date: Aug 2009
Location: Fishkill, NY
Posts: 5,211
Says estimated delivery 9/3-9/30
__________________
2015 Corvette Z06.. Lime Rock Park 1:01; Watkins Glen 2:14; Thompson Speedway 1:21
GQ4Life is offline   Reply With Quote
Old 08-09-2013, 09:55 AM   #3
route66
 
Drives: 66 coupe 78 pace car 2014 coupe
Join Date: Jul 2013
Location: ca.
Posts: 93
Dates

According to dealer the first date is the start date week and the second date is the delivery week date. I have not found anyone that has seen these listed like this before even Becky has not seen like this format. Becky says I am still at 3000 but my build says I have the FAY option on my car still.
route66 is offline   Reply With Quote
Old 08-09-2013, 12:58 PM   #4
laborsmith


 
Drives: 1969 Corvair, 2018 Camaro T4 RS
Join Date: Mar 2009
Location: Detroit Metropolitan Area
Posts: 2,881
How old is your dealer's software. Only asking because that looks like a format from teletype days. I don't have an example from then to compare, but it almost looks familiar but not quite.

The build week looks like 09/02/2013, and the 09/30/2013 looks like the estimated delivery date. I know Corvette used to give estimated delivery dates (which were pretty accurate) and see no reason for a change. Corvettes are shipped on a truck car hauler and not by train so GM has a much better idea of when a delivery SHOULD take place.

AND YES, it feels good to have internet access.

Laborsmith
laborsmith is offline   Reply With Quote
Old 08-09-2013, 02:37 PM   #5
route66
 
Drives: 66 coupe 78 pace car 2014 coupe
Join Date: Jul 2013
Location: ca.
Posts: 93
It is a Ca. bay area dealership so there software is up to date, like yes they have computers. I posted this because not many people have seen TPW yet and I thought it would be a little positive note that our cars are getting closer. My order was placed to GM back in April.
route66 is offline   Reply With Quote
Old 08-09-2013, 07:39 PM   #6
GQ4Life


 
Drives: 2010 Camaro SS LS3
Join Date: Aug 2009
Location: Fishkill, NY
Posts: 5,211
Quote:
Originally Posted by route66 View Post
It is a Ca. bay area dealership so there software is up to date, like yes they have computers. I posted this because not many people have seen TPW yet and I thought it would be a little positive note that our cars are getting closer. My order was placed to GM back in April.
Didnt think GM took first orders/allocations till may 31
__________________
2015 Corvette Z06.. Lime Rock Park 1:01; Watkins Glen 2:14; Thompson Speedway 1:21
GQ4Life is offline   Reply With Quote
Old 08-09-2013, 09:29 PM   #7
SilverRay
 
SilverRay's Avatar
 
Drives: 2014 Silver C7 Z51 Stingray
Join Date: Aug 2013
Location: Brownsburg, IN
Posts: 124
Quote:
Originally Posted by GQ4Life View Post
Didnt think GM took first orders/allocations till may 31
You are correct on May 31st, the order may have been placed in April but it wouldn’t have been accepted by GM until after May 31st and when the dealer had an allocation available, the information posted above is not from the GM OrderWorkbench where orders are made and status is updated.

I hope I’m not getting off topic but some dealers don’t explain to their customers how the ordering process works, that’s why so many members don’t understand why their stuck at 1100 status for so long. Simply put they won’t move until the dealer has an allocation for that order. Your pecking order of getting your Stingray built doesn’t go by the date of the order but rather the date that the order was accepted by GM production control (3000) meaning the parts are available to build this order. Good example is when Kelly stated elsewhere that if you’re at 3000 and have the FAY option then you’re good. When I ordered my Stingray my dealer had 3 allocations and 3 orders for FAY option but only 1 went to 3000 (mine) the other 2 had to eliminate that option to proceed to 3000. Sorry for rambling on
SilverRay is offline   Reply With Quote
Old 08-09-2013, 09:48 PM   #8
route66
 
Drives: 66 coupe 78 pace car 2014 coupe
Join Date: Jul 2013
Location: ca.
Posts: 93
I do have the workbench order also first entry 4/22 event code 1100 then I get up to 3300 on 7/28 and then like everyone else dropped back to to 3000 then after that got the current status on 8/8 which is what is posted. Keep in mind that I have the FAY ontion on my Order Workbench dated 7/16. So this should make it a early run batch build. I only posted this to give some encourgement when we might see some cars being build and delivered.
route66 is offline   Reply With Quote
Old 08-10-2013, 06:32 AM   #9
SilverRay
 
SilverRay's Avatar
 
Drives: 2014 Silver C7 Z51 Stingray
Join Date: Aug 2013
Location: Brownsburg, IN
Posts: 124
Right on! And yes the FAY is good at 3000.
SilverRay is offline   Reply With Quote
Old 08-10-2013, 10:31 AM   #10
SilverRay
 
SilverRay's Avatar
 
Drives: 2014 Silver C7 Z51 Stingray
Join Date: Aug 2013
Location: Brownsburg, IN
Posts: 124
Quote:
Originally Posted by route66 View Post
Has anyone seen this form before. Got from my dealer about my C7 order. It may be the beginning of dates for production. To me it shows TPW of course it could be changed week of 9-3 and delivery of week of 9-30. Also my car is supposed to be one of the cars that get the FAY option carbon fiber dash.

→ View Event History Current as of 08/05/2013 - 06:53 PM EDT
Effective Date ↑ ↓ Timestamp ↑ ↓ Data Element ↑ ↓ Before Value ↑ ↓ After Value ↑ ↓ User ID ↑ ↓
04/26/2013 04/26/2013 21:22:57 OPTIONS ROO XZKN9T
07/02/2013 07/02/2013 14:00:29 OPTIONS AP9 NPP dramirez001
07/27/2013 07/27/2013 21:17:44 CNTRY-PLT-LINE-CD 151 151 OM0PV005
08/02/2013 08/02/2013 22:07:16 CNTRY-PLT-LINE-CD 151 OM0PV005
08/02/2013 08/02/2013 22:07:16 ESTD-DELVRY-DT 2013-09-02 2013-09-30 OM0PV005
Ok route66 I believe I have some clarification, your information is in fact form the GM Orderworkbench, must have been the way they printed it or maybe they copied and pasted it to print, any rate it just came out a little garbled. I had my order pulled up this morning (not garbled), I have similar information. As it was explained to me; your first est. delivery date of 2013-09-02 comes under the before value column and that would be before you added option NPP on 7-02-2013, the second est. delivery date of 2013-09-30 comes under the after value column as a result of the option add or changed. My order changed from 2013-09-12 to 2013-10-10 after a change in options. I was told to take these with a grain of salt they are just projection and subject to change, as we have seen. However this seems to be in line with GM original estimate. Encouraging but disappointing that mind is going into October . Hope my info was helpful
SilverRay is offline   Reply With Quote
Old 09-25-2013, 04:44 PM   #11
route66
 
Drives: 66 coupe 78 pace car 2014 coupe
Join Date: Jul 2013
Location: ca.
Posts: 93
Quote:
Originally Posted by route66 View Post
Has anyone seen this form before. Got from my dealer about my C7 order. It may be the beginning of dates for production. To me it shows TPW of course it could be changed week of 9-3 and delivery of week of 9-30. Also my car is supposed to be one of the cars that get the FAY option carbon fiber dash.

→ View Event History Current as of 08/05/2013 - 06:53 PM EDT
Effective Date ↑ ↓ Timestamp ↑ ↓ Data Element ↑ ↓ Before Value ↑ ↓ After Value ↑ ↓ User ID ↑ ↓
04/26/2013 04/26/2013 21:22:57 OPTIONS ROO XZKN9T
07/02/2013 07/02/2013 14:00:29 OPTIONS AP9 NPP dramirez001
07/27/2013 07/27/2013 21:17:44 CNTRY-PLT-LINE-CD 151 151 OM0PV005
08/02/2013 08/02/2013 22:07:16 CNTRY-PLT-LINE-CD 151 OM0PV005
08/02/2013 08/02/2013 22:07:16 ESTD-DELVRY-DT 2013-09-02 2013-09-30 OM0PV005
Boy this was right on. Car showed build on the GM web site 9/13 and currently it is on a transporter heading to the San Jose Bay Area from Los Angles Ca. deliveries 9-25. Should see it by 9/27.
route66 is offline   Reply With Quote
 
Reply

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump


All times are GMT -5. The time now is 03:56 AM.


Powered by vBulletin® Version 3.8.9 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.