View Single Post
Old 05-23-2013, 12:31 PM   #82
laborsmith


 
Drives: 1969 Corvair, 2018 Camaro T4 RS
Join Date: Mar 2009
Location: Detroit Metropolitan Area
Posts: 2,881
Looked at my C6 order time line just now, and realized my above post inaccurate. It was about now (Mem. Day 2004) my salesperson informed me the dealership had used one of their two first consensus allocations for my order. There was no status change. In the first week of June my order was accepted (2500) than June 16 it went to 3000. On June 23 while still at 3000 it got a TPW (08/02/2004) and eta (08/23/2004). On 07/08/2004 status 3100 then on 07/28/2004 status 3400. The car was assembled the week of 08/02/2004, arrived at the dealer 08/23 and my driveway 08/24. VIN ending number 0708.

So the first status level change should be between 05/28/2013 and 06/04/2013.

Hopes this more accurate info helps.


Laborsmith
laborsmith is offline