Time between status codes
My order was placed for a Z06 on 5/29 but I was told they were not bumping orders against allocations for 2016 models until mid June as they were still building 2015 models.
on 6/18 it went from 1100 to 3000 with a TPW of 7/13
on 7/6 it went from 3000 to 3400, still TPW of 7/13
on 7/14 it showed 4B00, built & bayed.
It was actually built on 7/13, inspected, prepped, and shipped early on the 14th and arrived at my dealer around 10pm on 7/14. I'm about 8 1/2 hrs from Bowling Green. Dealer received the complete load on the 14th and had another full load later that week.
|