Chevrolet Corvette Stingray C7 Forum

Chevrolet Corvette Stingray C7 Forum (https://www.corvette7.com/forums/index.php)
-   C7 Ordering, Pricing, Order Tracking Discussions (https://www.corvette7.com/forums/forumdisplay.php?f=164)
-   -   How Long Will Delivery Take? (https://www.corvette7.com/forums/showthread.php?t=343012)

Nate GM 02-18-2014 01:44 PM

How Long Will Delivery Take?
 
Hey everyone, I'm going to be ordering a C7 with the Z51 package around March 7 and was wondering how long I should expect to wait until I take delivery at my dealership?

I know that there are a lot of different variables that go into it and that there's no way of knowing for sure, but I'm just looking for a general estimate/guess. I am ordering from a small dealership that is just getting their license to sell the Corvette around March 2. I haven't been following the forums much lately so I wasn't sure if there was still a constraint on Z51's?

Thanks in advance, I know this car will be worth the wait! :hail: :c7:

thespymaster 02-18-2014 02:21 PM

Quote:

Originally Posted by Nate GM (Post 7431001)
Hey everyone, I'm going to be ordering a C7 with the Z51 package around March 7 and was wondering how long I should expect to wait until I take delivery at my dealership?

I know that there are a lot of different variables that go into it and that there's no way of knowing for sure, but I'm just looking for a general estimate/guess. I am ordering from a small dealership that is just getting their license to sell the Corvette around March 2. I haven't been following the forums much lately so I wasn't sure if there was still a constraint on Z51's?

Thanks in advance, I know this car will be worth the wait! :hail: :c7:

All depends on your dealer allocation(s). From order acceptance to build, I see average about 5-6 weeks!

Speak with Becky @RodgersChevrolet to get your best deal..

laborsmith 02-18-2014 03:14 PM

As the spymaster said, six weeks unless it arrives quicker or takes longer. The Z51 option remains on limited constraint and there is no way a dealer with a small number of allocations can be certain he will be able to get an order thru with that option. When time comes that your order can be matched against allocation you may be told the order can not proceed unless changed. Or it may go thru as ordered; you will not know until that moment of decision arrives.

Also allocations must be used, if not by the original dealer than by another dealer, to keep production moving. If the original dealer does not use it at that moment, that allocation is gone, not just for that ordering period, not just for that model year, but also for the next model year. Which is why six or eight dealers get half of the allocations: in the past they took allocations that other dealers let pass.

Laborsmith

Nate GM 02-18-2014 04:56 PM

Thanks guys! Wow 5-6 weeks would be great, I was honestly expecting it to be longer since it's a new generation.

I'm going to visit the dealership this week and make sure that they definitely have an allocation for me. Hopefully I can get lucky and take delivery before May.

C7Driver 02-23-2014 03:40 PM

Ordered my Stingray on Dec. 30th. It's a 2LT, Z51, A6, Mag Ride, NPP & NAV. Car was built on Feb. 10th and shipper had the car on Feb. 14th. If dealer is correct it will arrive on Feb. 26th. That's nine weeks total. :thumbsup:

hamothare 02-25-2014 03:25 PM

Then why is it I have been waiting for my C7 for over 4 months. It has been at 1100 status for over 4 months. Is there anything I can do. hamothare

Kochaloch 02-25-2014 03:58 PM

Quote:

Originally Posted by hamothare (Post 7450282)
Then why is it I have been waiting for my C7 for over 4 months. It has been at 1100 status for over 4 months. Is there anything I can do. hamothare

I waited 5 months for my order to get accepted due to constraints and allocation. Only thing you could do is find a dealer that has the allocation ready to order.

laborsmith 02-25-2014 05:11 PM

What Kochaloch ^ said. Allocation is the big problem, constraints could be but I doubt it as dealers (at least for me) will tell me that if I drop an option on constraint the order will proceed and you have not indicated that has happened.

Laborsmith

torchc7 02-26-2014 04:39 PM

lucky you 5-6 weeks
 
i ordered jan 13th 2014, im just midway thru the 6th week, as of today 2-26, I am an estimated 6 weeks away. order status today is accepted by chev, hopefully sooner

3lt, vert, manual. chrome rims, perforance exhaust other misc...torch red/black napa

1000 Order On Hold at Dealership
1100 Order Placed at Dealership
1101 Order Entered into System
1102 Order Entered via Web
2000 Order Accepted by Chevrolet
2001 Order Generated to Dealer
2005 Order Replaced with GM Prospec Order
2030 Order Edited by Chevrolet
2050 Order Changed
2500 Order Preferenced (or "Picked Up" or "Imaged"), Sent to Production
3000 Order Accepted by Production Control
3100 Order Available to Sequence (now becomes more stable)
3300 Order Selected and Scheduled for Production by Assembly Plant (Target Production Week usually available now)
3400 Order Broadcasted for Production (Internal Plant Order Produced)
3800 Vehicle Produced
4000 Vehicle Available to Ship
4104 Bailment Invoice Created
4B00 Bayed ("B", not 8)
4106 Bailment Released
4150 Vehicle Invoiced (Dealer Billed)
4200 Vehicle Shipped
4300 Intermediate Delivery
4V03 Estimated Delivery Date
4800 Rail Ramp Unload
5000 Vehicle Delivered to Dealer
6000 Vehicle Delivered to Customer
9000 Order Cancelled


All times are GMT -5. The time now is 08:24 PM.

Powered by vBulletin® Version 3.8.9 Beta 4
Copyright ©2000 - 2024, vBulletin Solutions, Inc.